Follow-up
Encyclopedia : F : FO : FOL : Follow-up
In the follow-up phase of Fagan Inspection all defects fixed(by the author) in the rework phase should be verified. The moderator, usually, is responsible for verifying it. Sometimes, fixed work can be accepted without verifying(when the defect was trivial), or full reinspection process is performed by the inspection team(not only the moderator) when the defect was complicated or critical. If verification fails, go back to rework process; the author try to fix the defect again.
See also
From Wikipedia, the Free Encyclopedia. Original article here. Support Wikipedia by contributing or donating.
All text is available under the terms of the GNU Free Documentation License See Wikipedia Copyrights for details.
