GO Transit
Encyclopedia : G : GO : GOT : GO Transit
| GO Transit | |
|---|---|
GO Transit
| |
| Reporting marks | GOT |
| Locale | Greater Toronto Area |
| Years of operation | 1967 – Present |
| Track gauge | 4 ft 8½ in (1435 mm) |
| Headquarters | Toronto, Ontario |
GO trains are easily identifiable; they are double-decked, green and white, and the cars are shaped like elongated octagons. These Bombardier BiLevel carriages were originally designed for GO in the 1970s, and are now used by a number of other commuter railways across the continent. GO buses are not double-decked (although a BC Transit bus was used in an experiment during May 2002), but they are also characterised by a green and white colour scheme. Most GO buses are inter-city coaches (see directory below).
Although it owns its locomotives and carriages, GO contracts out the operation of its trains to the Canadian Pacific Railway on the Milton line, and to CN on all others. As a result, GO service is sometimes disrupted by labour disputes in which it is not a direct participant.
Service area
GO trains and buses serve a population of six million in a 8,000 km² area (3,000 sq.mi.) radiating from downtown Toronto to Hamilton and Guelph in the west; Orangeville, Barrie, and Beaverton to the north; and Port Perry, Oshawa, and Newcastle in the east. The buses extend GO's service as far as over 100 km (about 60 miles) from downtown Toronto. GO connects with every municipal transit system in the Greater Toronto and Hamilton areas, including the Toronto Transit Commission (TTC).
The Greater Toronto Area consists of the City of Toronto and the surrounding Regions of Halton, Peel, York, and Durham. GO Transit also serves the neighbouring City of Hamilton, and reaches into Simcoe, Dufferin, and Wellington Counties.
The GO system map shows seven train routes, all departing from Toronto's Union Station and mostly named respectively after the outer terminus of train service:
|
A |
Lakeshore West line (to Hamilton) |
|
B |
Lakeshore East line (to Oshawa, with buses to Newcastle) |
|
C |
Milton line |
|
D |
Georgetown line, with buses to Guelph |
|
E |
Bradford line, with buses to Barrie |
|
F |
Richmond Hill line |
|
G |
Stouffville line, with buses to Uxbridge |
However, GO's timetables show a single Lakeshore line, which is perhaps a more appropriate nomenclature since many trains provide through service between stations east and west of Toronto.
Most of the GO Train route network operates only in peak rush-hour periods and then only in the primary direction of travel. For example, as of February 2006, the Milton line service consists of six trains leaving Milton each weekday between 6:25 and 8:00 a.m., and six trains leaving Toronto each weekday between 4:30 and 7:00 p.m.
There is off-peak train service on parts of the Lakeshore and Georgetown lines. Hourly trains operate on weekdays between Oshawa and Burlington; on weekends this is shortened to a Pickering–Oakville service. The Georgetown line has a more limited off-peak train service between Toronto and Bramalea.
Still other GO Buses are independent of rail services. Some parts of the route network use expressways (such as the frequent Toronto–Hamilton express bus via the Queen Elizabeth Way) while others are more local in character. Toronto Pearson International Airport is served by a route from Brampton to Yorkdale and York Mills subway stations. Buses serving downtown Toronto operate to a terminal adjacent to Union Station.
Connections
Many municipal transit systems connect with GO Trains. The Toronto Transit Commission (TTC) provides the most connections with GO Trains and convenient connections can be made between the trains and TTC buses, streetcars, and subway trains. Immediately adjacent to the GO concourse at Union Station is the Union station on the TTC's Yonge-University Spadina subway line. Connections at Union Station with the TTC's Harbourfront (509) and Spadina (510) streetcar lines are also possible.Four stations on the TTC's Bloor-Danforth subway line and one on the Sheppard line are close to GO Train stations;
- TTC Kipling has a direct connection to GO Kipling (on GO's Milton line),
- TTC Dundas West is near GO Bloor (Georgetown line),
- TTC Main Street is near GO Danforth (on the Lakeshore East line), and
- TTC Kennedy has a direct connection to the GO Kennedy (on the Stouffville Line).
- The TTC Leslie station does not currently connect with the nearby GO Oriole station on the Richmond Hill line, but there has lately been consideration of moving GO Oriole next to TTC Leslie Station in the future.
Ridership
GO runs 180 train trips and 1,430 bus trips daily, carrying about 190,000 passengers on a typical weekday — 160,000 on the trains and 30,000 by bus. GO says that their ridership growth has continually exceeded expectations. In the first year of operation, 2.5 million passengers were carried. The combined rail and bus system today handles more than 47 million riders annually.At least 96% of the train ridership is to and from Union Station in downtown Toronto, while about 70% of all bus passengers travel to and from the City of Toronto.
History
GO Transit was created and funded by the provincial government in 1967 as Government of Ontario Transit (hence the acronym 'GO') and was financed entirely by the Province of Ontario until the end of 1997. The Province subsidized any operating costs that were not recovered through revenue, as well as all capital costs. Responsibility for the system was then transferred to the Toronto Area Transportation Operating Authority (TATOA) and later to the Greater Toronto Services Board as part of the province's 'downloading' initiative, before finally returning to the province as a Crown Agency under Greater Toronto Transit Authority (GTTA).GO began as a three-year experiment in May 1967 running single-deck diesel multiple units on a single rail line along Lake Ontario's shoreline. All day GO Train service ran from Oakville to Pickering with limited rush hour train service to Hamilton. Lakeshore GO trains carried 2.5 million riders that first year and was considered to be a success. GO Bus service, which started out as an extension of the original Lakeshore train line, has since become a full-fledged network in its own right. It feeds the rail service and serves communities that trains do not reach.
Expansion continued in the 1970s with the introduction of the Georgetown line in 1974 and the Richmond Hill line in 1978. Also in 1978 the GO Transit bi-level railcars were introduced, although many of the bi-level trains had to run with a single level cab car at first. Finally in 1979 the current GO Train concourse at Union Station was built.
The 1980s proved to be the most exciting time for GO Transit as in 1981 the Milton GO Train line opened. Then just one year later in 1982 the Bradford line and Stouffville line opened after the newly created VIA Rail Canada cut passenger rail service to these corridors. Towards the end of 1982 came GO Transit's moment of truth, as the Ontario Minister of Transportation and Communications, James Snow, announced the launching [GO ALRT], an interregional rapid transit program. This is a transit system that would have allowed computer controlled trains to run at a maximum frequency of two minutes instead of the usual twenty minutes during rush hour. One line would have replaced the Lakeshore GO Train line and would have run from Hamilton to Oshawa. The other would have connected Oakville with downtown Mississauga, Pearson Airport, downtown North York and downtown Scarborough before finally terminating at Pickering. A short lived third line would have run north-south connecting Brampton with Mississauga. The rail cars (designed by The Urban Transportation Development Corporation) started out as a ICTS train similar to the Scarborough RT later evolved in 1983 to the length of roughly a Toronto subway train. Further redesign in 1984/85 indicated that greater carrying capacity was going to be required resulting in cars similar in length to VIA's LRC coach car. Meanwhile Hamilton residents were strongly opposed to the plan which caused the proposal to go under in 1985 which was also a result of long time Ontario PC premier Bill Davis being replaced by the late Ontario PC leader Frank Miller who served only a few months in office.
With the end of GO ALRT and the creation of a coalition provincial government between the Ontario NDP and Ontario Liberals, it was decided that certain parts of the GO ALRT proposal would live on, in the form of a GO Train extension of all-day GO Train service to Whitby and Burlington. The tracks between Pickering and Whitby were originally built for the GO ALRT system but were soon converted to handle conventional GO Trains. All day GO Train service was brought to Whitby in 1988.
Enter the 90s, the decade that saw an end to the neverending growth of GO Transit. Ridership shrank as a result of the early 90s recession. In spite of this GO extended limited rush hour GO Train service to Barrie, Guelph, Acton and Oshawa in 1990. In May, 1992, while GO Transit celebrated its 25th birthday, all-day GO Train service was extended to Burlington with the building of a new station at Aldershot. However in 1993 former Ontario premier Bob Rae announced the Social Contract, which would see a "Temporary" reduction in spending on services. Consequentially GO Train service to Barrie, Guelph and Acton was eliminated. All day GO Train service to Whitby and Burlington was reduced to rush hours only (while limited Rush Hour train service to Oshawa and Hamilton remained in place. All day lakeshore train service existed only between Pickering and Oakville. In 1995 a new set of tracks and a station were built in Oshawa, allowing for frequent rush hour GO Train service to Oshawa.
With the election of former Ontario premier Mike Harris in June, 1995, plans for expanding GO Transit were put on hold in order to gain control of provincial spending and deliver its policy of lower taxes, balanced budgets and more jobs.
In January 1997, the province announced it would hand over funding responsibility for GO Transit to the Greater Toronto Area municipalities (which consist of the City of Toronto, and the Regions of Halton, Peel, York, and Durham) as well as the neighbouring Region of Hamilton-Wentworth (which became the new City of Hamilton on 1 January 2001). In exchange, the province would assume certain other funding responsibilities from municipal governments.
A year later, on 1 January 1998, the GTA municipalities and Hamilton-Wentworth (now the city of Hamilton) began to fund GO Transit, cost-sharing all of GO's capital expenses and any operating costs that are not recovered through passenger fares and other revenue. On 1 January 1999, a new municipal agency created by the province came into being: the Greater Toronto Services Board (GTSB), composed of regional chairs, municipal mayors, and local councillors from the GTSB's service area. GO Transit transferred over to the municipal sector as an arm of the GTSB on August 7, 1999, thus completing the process that had begun with the funding change of 1998.
In 2000 all day GO Train service was restored from Burlington to Whitby and finally brought to Oshawa (although weekend Lakeshore GO Train service would still only see service between Pickering and Oakville).
On September 27, 2001, Ontario Premier Mike Harris announced that the Provincial government would be taking back responsibility for GO Transit, and putting $3 billion into public transit in Ontario. For the practically impoverished GO, it was a welcome funding commitment.
The GO Transit Act, 2001 was passed by the Ontario Legislature on December 5, 2001. As of January 1, 2002, GO Transit is no longer the responsibility of the municipalities of the Greater Toronto Area and Hamilton. GO has returned to provincial responsibility as a Crown Corporation, and the Greater Toronto Services Board no longer exists.
Future expansion
GO Transit has a ten-year plan in place, which includes provisions for new train stations, more parking spaces at existing stations, and increasing service on some (or all) existing train lines. While no new train lines are being planned, here are some of the improvements being planned, or in the process of completion:- Construction of the Mount Pleasant Station on the Georgetown line (Highway 7 and Creditview Road) continues, but the station has been open for service since February 2005.
- Expanding the Highway 407 bus service to York University; other academic institutions served on the 407 routing include: McMaster University in Hamilton, Ontario, Sheridan College in Oakville, Ontario, Centennial College and University of Toronto at Scarborough in eastern Toronto, and Durham College and UOIT in Oshawa, Ontario.
- Increasing available parking spaces at Bradford and Milton stations, along with multi-deck parking at several stations.
- Moved the Milliken (GO Station) south of Steeles Avenue into Toronto from York Region on 6 September 2005.
- Construction of a new Kennedy station, which will allow for transfers to/from the TTC (Bloor-Danforth Line, Scarborough RT or connecting TTC bus services) that opened for service on 2 June 2005.
- Improved overnight train storage facilities at Milton, Hamilton and Mount Pleasant; permitting GO Transit to operate longer trains, improve train schedule reliability and add new train trips.
- Installation of railway crossing protection arms at various roads.
- Improving accessibility to GO Transit's services for the physically challenged.
- Fleet expansion, including buses and Bombardier Bi-Level Rail Cars, and the replacement of old locomotives with more reliable and powerful models; permitting more train and bus trips, along with longer trainsets.
- Extending platforms at several Lakeshore and Milton Corridor stations to permit 12-car train sets by 2008.
- Adding a new station on the Milton Corridor, located near Highway 401 and Winston Churchill Boulevard in Mississauga, named Lisgar, which will open in 2007.
- A third track from Burlington to Bayview Junction (between Aldershot and Hamilton) on the Lakeshore West line, and one from downtown Toronto to Scarborough on the Lakeshore East, to facilitate improved schedule reliability and increased service on the Lakeshore and Stouffville corridors
- Rail to rail grade separation started in Markham, Ontario, on the Stouffville Line (see below).
- Improvements to Union Station to increase passenger access and capacity-handling.
Larger-scale infrastructure improvements are also being planned, including:
- Rail-to-rail grade separations where the Bradford and Stouffville lines cross CN's east-west freight line, to allow for increased service, and at the West Toronto Diamond, to take the CN tracks on the Georgetown line under the CP tracks so that more trains can run more reliably--constuction on the Stouffville Line began in May 2006.
- Increased track capacity on the Georgetown line's busy section between Brampton and northwest Toronto to allow more frequent train movements, and a new train layover facility near Mount Pleasant station.
- Track upgrades on the Milton line to run more peak and off-peak trains.
- The controversial proposal for the Blue22 high-speed train service between the Pearson Airport and Union Station via the Georgetown line using Bombardier diesel cars. So named for the numbers of minutes the trip would take between Pearson and Downtown (one-way distance around 30km). Because the Airport is located some 5km from the line, a proposed spur line would need to be constructed to connect the trains to the APM monrail currently serving the terminal facilites. It is uncertain how this service would be coordinated with GO Transit, which uses the same Georgetown Line and extensive track uprages along this line would be required. The project was announced as a transportation priority by the previous federal Liberal government in 2000 and a contract to build the diesel cars was awarded in 2003, with the expectation of project completion by 2008. At the current pace, this is unlikely, and is opposed by residents in places like Weston.
- Extending the Bradford line train service to the Barrie, Ontario area, using track corridor owned by the City of Barrie (who acquired the right of way following CN's abandonment, after GO Trains last ran there)
- Introducing commuter bus services to Peterborough, to Niagara Region, and to Guelph and Waterloo Region to build the market for train service.
GO is also developing a bus rapid transit (BRT) system that will provide extensive east-to-west express service across the GTA, using transit priority measures and park-and-ride stations with links to local transit. GO's already popular Highway 407 Express buses are the BRT's precursor, showing that demand for such service is already there.
The former provincial Minister of Transportation announced plans in 2005 to introduce the GTA Farecard, an unified smartcard-based payment system for the entire Greater Toronto Area similar to the Octopus Card used in Hong Kong.
Vehicles and staff
Vehicle: 288 buses, 45 locomotives, 392 coaches (2006) Employees: 1,193 (1991)Source: Toronto Region, Ontario http://home.cc.umanitoba.ca/~wyatt/alltime/toronto-suburbs-on.html
Locomotives
The GM loco were manufactured at the Diesel Division in London, Ontario:- General Motors Diesel Division EMD FP7A & F7B locomotives (used as power cars)
- General Motors Diesel Division F59PH I locomotive
- General Motors Diesel Division F59PH II locomotive
- General Motors Diesel Division F59PH III locomotive
- General Motors Diesel Division F59PH IV locomotive
- General Motors Diesel Division GP40TC locomotive
- General Motors Diesel Division GP40-2L locomotive
- General Motors Division F40PH locomotive
- General Motors Diesel Division GP40U locomotive
- General Motors Diesel Division F59PH locomotive
Multiple units
The HS MU were manufactured at the HS transit shops in Thunder Bay, Ontario, now owned by Bombardier Transportation Limited:- Hawker-Siddeley RTC-85/85C SP (Single-level self-propel unit) - retired
Coaches
- HSC Bi-Level I coach
- HSC Bi-Level II coach
- UTDC Bi-Level III coach
- UTDC Bi-Level IV coach
- UTDC Bi-Level V coach
- UTDC/Bombardier Bi-Level VI coach
- Bombardier Transportation Bi-Level VII coach

- Bombardier Transportation Bi-Level VIII coach
- Bombardier Transportation Tri-Rail Bi-Level coach - leased
- Bombardier Transportation West Coast Express Bi-Level coach - leased
- Pullman-Standard Bi-level coaches - leased from CPR Montreal commuter rail service (1974) and CN&W (1976)
Buses
GM buses were manufactured at the Diesel Division in London, Ontario and Orion/Ontario Bus buses in Mississauga, Ontario:Retired
- GMDD T8H-5307A
- GMDD S8H-5304A
- Ontario Bus Orion I 01.508
- Motor Coach Industries MC-9
- MCI 102A2
- New Flyer D40S
Active
Denotes wheelchair-accessible vehicles.Special Constables
GO Transit has Special Constables patrolling the transit agencies' properties and vehicles. The rail components are also patrolled by either CN Police or Canadian Pacific Railway Police Service.
Contractors
- Gray Coach Lines - defunct
- Travelways
- Charterways Transportation Limited
- Penetang-Midland Coach Lines (PMCL)
- CN engineers and conductors operate all GO Trains excluding those operated on Milton line.
- CP engineers and conductors operate GO Trains on Milton line only.
- Exclusive Advertising - Represents 3,950 interior poster faces and 790 digital displays throughout the GO Train fleet.
Terminals
- Brampton Bus Terminal
- GO Finch Bus Terminal - former GO York Region Terminal
- Newmarket Bus Terminal
- Oshawa Bus Terminal
- Scarborough Town Centre Bus Terminal
- GO Union Station / Bus Terminal
- GO Yorkdale Bus Terminal
- York University GO Station (Bradford Line) - off campus
Facilities
- GO Transit Willowbrook Yard - ex-CNR car repair track and next to CNR Mimico Station - covering 17 hectares of land and 13,000 m2 of workshops
- North Bathurst Yard 1987 - formerly of CN
- Georgetown
- Guelph Junction (Milton)
- Steeprock Bus Garage 1979 - stores 100 buses, 50 bus staging areas, 12 bus repair bays
- CNR MacMillian Yard
- East Region Office - Middlefield Road and McCowan Road at CPR Agincourt Marshalling Yard
External links
- [GO Transit]
- [FindTheWay.ca]
- [History of Regional Transit in Toronto]
- [GO Transit Significant Dates]
- [Building GO-Transit: The Rail Commuter Initiative of The Government of Ontario & Canadian National Railways, People in the project 1965-1969]
- [Exclusive Advertising (representing GO Train interior advertising)]
| [http://encycl.opentopia.com/ edit ] Passenger railways of Canada
|
| Metro systems: Montreal Metro | Toronto subway/RT | Vancouver SkyTrain |
| Light rail: C-Train (Calgary) | Edmonton Light Rail | O-Train (Ottawa) | Toronto streetcars | Toronto Pearson Airport People Mover |
| Long distance: VIA Rail | Ontario Northland Railway | Canadian National Railway | Quebec North Shore and Labrador Railway | Tshiuetin Rail Transportation | White Pass & Yukon Railway |
| Commuter rail: GO Transit (Toronto) | Agence métropolitaine de transport (Montreal) | West Coast Express (Vancouver) |
From Wikipedia, the Free Encyclopedia. Original article here. Support Wikipedia by contributing or donating.
All text is available under the terms of the GNU Free Documentation License See Wikipedia Copyrights for details.

