Opentopia Directory Encyclopedia Tools

Interstate 476

Encyclopedia : I : IN : INT : Interstate 476


Interstate 476 (abbreviated I-476, portions of which are nicknamed the Blue Route and The Northeast Extension) is a 130.5-mile long combination Interstate loop and spur highway that travels between I-95 near Chester, Pennsylvania and I-81 near Scranton, Pennsylvania. The first 20.5 miles is a freeway built to Interstate Highway standards, while the remaining 110 miles is part of the Pennsylvania Turnpike system as the Turnpike's Northeast Extension which was completed in 1957. The non-turnpike part generally parallels Pennsylvania Route 320, and upon the completion of an interchange between the Pennsylvania Turnpike and I-95 near Bristol, Pennsylvania in 2009 (The Pennsylvania Turnpike/Interstate 95 Interchange Project), will then become part of a multi-county beltway around Philadelphia. The highway is mostly four lanes, with an 11-mile section between PA Route 3 and the Mid-County barrier toll on the Pennsylvania Turnpike having six lanes.

History

The portion of Interstate 476 between Interstate 95 and Interstate 276, running north-south through Delaware County, Pennsylvania is nicknamed the Blue Route, but is officially called the Mid-County Expressway. Originally planned as far back as 1928, I-476 was later incorporated as a so-called "Chester Extension" of the Pennsylvania Turnpike in the late 1940's. Since the beginnings of the Interstate Highway system, the PA Turnpike Commission dropped the Chester Extension project and the forerunner to the present-day Pennsylvania Department of Transportation (PennDOT) picked up the project, designating it first as I-480 (as I-76 back then was designated as I-80S), and later as I-495. The present-day I-476 designation was given in 1974 when I-80S became I-76.

As one of the most controversial Interstate Highways in Pennsylvania, construction of I-476 began in 1968, but was not completed until 1991, due mainly to litigation between the Pennsylvania Department of Transportation and residents in Marple Township, Pennsylvania. An agreement in 1984 led to the present lane configuration. The compromise, due to Swarthmore resident's desire to limit pollution to its district, led to the throttling down from three lanes of traffic in each direction to two. Ironically, this has led to bottleneck conditions in the area, and ultimately, more pollution from slowed down vehicles spending more time in this stretch of roadway [[Citing sources citation needed]]. The connection with the Pennsylvania Turnpike was not completed until 1994.

The birth of the "Blue Route" nickname.
Enlarge
The birth of the "Blue Route" nickname.

The highway is designated as a federal scenic route, thus prohibiting the erection of advertisement billboards along the entire 20.5-mile length of the Blue Route portion of the highway.

This designation was tested shortly after 9/11 when two local residents took it upon themselves to erect a flagpole bearing the American Flag at the Pennsylvania Route 3 interchange of the roadway, which officials initially believed was a violation of the prohibition. However, the flag remains erect to this day. High above the northbound lanes near the interchange with U.S. Route 1 in Marple Township, a private resident displays illuminated "Jesus" signage, narrowly avoiding violation since the sign is technically on private property that just happens to face the Blue Route.

The 'Blue Route' name derives from a 1958 location report indicating various proposed geographic configurations of a proposed north-south mid-county expressway with lines of various colors on a map. The "blue route" won out over other contenders, which included a more easterly "red route" and "yellow route" and a more westerly "green route". Prior to receiving the current Interstate highway designation, it was numbered as I-480 (as I-76 was designated as I-80S before 1974), and I-495 on planning maps.


SECTION 300 - CONSTRUCTION CHRONOLOGY IN MARPLE WOODS AREA - 4/84 Federal Highway Administration approves revised environmental impact statement for Blue Route. 3/85 U.S. Judge Donald W. VanArtsdalen approves Blue Route plans. 4/3/85 Groups opposing Blue Route appeal ruling to U.S. 3rd Circuit Court of Appeals. 4/24/85 Meeting held between Marple Woods residents and highway designers. Residents object to driveway design. 8-29-85 Second meeting held between Marple Woods residents and highway designers. Marple Woods driveway design altered. 10/4/85 U.S. 3rd Circuit Court of Appeals upholds Blue Route plans. Opponents appeal to U.S. Supreme Court. 11/18/85 Third meeting held between Marple Woods residents and highway designers. 3/24/86 U.S. Supreme Court refuses to hear appeal. 1/14/87 Opponents argue against Blue Route during hearing before U.S. Army Corps of Engineers for Sec. 404 permit. 4/8/87 Last meeting held between Marple Woods residents and highway designers, landscaping plans reviewed in detail. 11/23/87 Sec. 404 permit issued. Last major hurdle to construction cleared. 4/14/88 Sec. 300 contract let. 5/10/88 Contract awarded to F.C. Wagman. 6/6/88 Sec. 300 Order to Proceed with construction. 6/8/88 Four workers observed with map at Hotland Run North branch. 6/15/88 One worker observed at adjoining Berczynski property driveway. "Road Construction 500 Feet" signs installed. 6/17/88 One small backhoe seen on Old Marple Road. 6/20/88 Five vehicles on Old Marple Road wetland creation site. 6/21/88 Surveyors on driveway of Marple Woods. Flatbed truck and beginning of right-of-way fencing around wetland creation site. 6/22/88 Additional driveway surveying. Begin clearing of wetland site. 6/28/88 Lane restrictions and barrels on Old Marple Road. Extensive clearing of wetland site. 7/6/88 Moving of Galantino property fence on south side of Old Marple Road. 7/15/88 Clearing of new driveway/off ramp area. 7/20/88 Clearing/grading of mainline area. 7/21/88 Clearing/grading along Old Marple Road, steep slope area. 7/24/88 Beginning of right-of-way fencing in Marple Woods across from Red Oak Circle. 8/1/88 Stakes placed along Marple Woods Drive. 8/3/88 R-o-w fence installed along driveway and Marple Woods Drive. 8/8/88 Clearing of new driveway on western side of Marple Woods property. 8/11/88 Clearing of Marple Woods Drive and driveway areas. 8/12/88 Extensive clearing of Marple Woods r-o-w areas. Begin grading of new driveway. 9/27/88 Begin support column frame for southbound I-476 ramp over Old Marple Road. 10/5/88 Southbound support column completed. 10/12/88 Clearing of east side of old driveway. Rest of Old Marple Road relocated. 12/9/88 Mainline work continuing on column supports on north side of Old Marple Road. 2/89 First overpass over Route 1 completed. 5/9/89 Gas line relocation work continuing on new driveway. 6/12/89 Water line relocated to top of new driveway. New support columns for mainline south of Old Marple Road. 7/17/89 Paving of part of relocated Old Marple Road. 9/5/89 New Driveway paving completed. Water line to new water meter pit connected. 10/3/89 New driveway opened. 10/10/89 Grading of sound barrier area. 10/12/89 Old driveway permanently closed, top torn up. Work continuing on rest of relocated Old Marple Road. 11-16-89 Work on sound barriers continuing, with installation beginning adjacent to new driveway. 2-5-89 Traffic on Media By-pass shifted to northbound lanes. 12-6-89 Sound barrier installation nearly completed. 12-89 to 3/90 Blasting continues along mainline for drainage pipe installation. Extensive construction of support columns for mainline from Route 1 to Old Marple Road. 4/90 Paving of mainline below sound wall area. 5/18/90 Overpass beams placed for part of northbound on-ramp. 5/21/90 Street light for Old Marple Road/driveway intersection. 12/19/91 Blue Route opens to traffic.

The portion of Interstate 476 north of the I-276 interchange is the Northeast Extension of the Pennsylvania Turnpike, and was formerly designated Pennsylvania Route 9 until being redesignated as an interstate highway on November 1, 1996.

In 2005, the Blue Route began a massive, yet much-needed, rehabilitation between Interstate 95 and Pennsylvania Route 3. Paving, bridge repair, and ramp maintenance were just a sampling of the improvements performed on the roadway.

It remains one of the few highways in the Philadelphia region to feature ramp meters, which utilize a type of traffic signal that controls the amount of vehicles entering the road during rush hours. Deactivated for a lengthy period of time shortly after their initial installation, PennDOT recently decided to reintroduce the meters to ease massive traffic flow from the MacDade Boulevard, Baltimore Pike, U.S. Route 1, Pennsylvania State 3, and U.S. Highway 30 interchanges.

At 130.5 miles (209 km), I-476 is America's longest three-digit interstate, surpassing I-495 in Massachusetts, with a total distance of just under 130 miles. It's even longer than the following 2-digit interstates: Interstate 12, Interstate 19, Interstate 27, the western Interstate 86, Interstate 97, and Interstate 99 (though I-99 will eventually become longer). By comparison, the average length of a three-digit interstate is 21 miles (34 km). Nevertheless, no three-digit interstate is longer than its parent (to compare, this road's parent, the eastern Interstate 76, runs 434 miles--almost 700 km).

Exit list

Until 2002, exit numbers on I-476, like that of all Pennsylvania Interstates as well as the Pennsylvania Turnpike system, were numbered in sequence. In 2002, PennDOT started changing the exit numbers to the new milepost system, while the Pennsylvania Turnpike Commission did the same a short time later, along with renumbering all of the Northeast Extension's mileposts to reflect the starting of I-476 in Chester, as the Northeast Extension originally started counting its miles at the old interchange with the East-West Mainline (Interstate 276) in Norristown.

Exit numbers Exit name Notes
new old
Junction with Interstate 95 Access to Chester and Commodore Barry Bridge
1 1 MacDade Boulevard Becomes E. 22nd Street in Chester
3 2 Media-Swarthmore (Baltimore Pike)
5 3 Lima-Springfield (U.S. Route 1)
9 4 Broomall-Upper Darby (PA 3)
13 5 Villanova-Saint Davids (U.S. 30) (Villanova University this exit)
15 6 Valley Forge-Philadelphia (I-76)
16 7 Conshohocken, Pennsylvania
18 8 Germantown Pike--EAST-Plymouth Meeting
19 9 Mid County Interchange--Germantown Pike--WEST-Norristown Connection to East-West Turnpike (I-276) from I-476 N.B.
Begin Pennsylvania Turnpike Northeast Extension (I-476)
31 31 Lansdale (PA 63)
44 32 Quakertown (PA 663)
57 33 Lehigh Valley (U.S. Highway 22) Connects with Interstate 78
Lehigh Tunnel located at mile marker 72 (still in use)
76 34 Mahoning Valley (U.S. Highway 209) Access to western Pocono towns of Lehighton, Jim Thorpe, Palmerton
94 35 Pocono (PA 940) Connects with Interstate 80 to Delaware Water Gap
104 36 Wilkes-Barre (PA 115)
M.P. 112.5 Wyoming Valley Toll Plaza (barrier toll) Begin all-cash collection
114 37 Wyoming Valley (PA 315) Connects with Interstate 81
M.P. 122.1 Keyser Avenue Toll Plaza (barrier toll)
123 38 Keyser Avenue
M.P. 130.7 Clarks Summit Toll Plaza (barrier toll)
131 39 Clarks Summit (Interstate 81) Original Exit 38. Known as Scranton before opening of Keyser Avenue

External links

[http://encycl.opentopia.com/ edit ]
Auxiliary routes of Interstate 76

 


From Wikipedia, the Free Encyclopedia. Original article here. Support Wikipedia by contributing or donating.
All text is available under the terms of the GNU Free Documentation License See Wikipedia Copyrights for details.

Search Titles
0123456789
ABCDEFGHIJ
KLMNOPQRST
UVWXYZ?

E-mail this article to:

Personal Message: