The Taipei Rapid Transit System (Traditional Chinese: ; pinyin: , also known as the MRT, Metro Taipei, or by locals simply as the Traditional Chinese: ; pinyin: ) is a series of underground and elevated metro and VAL systems throughout the Taipei metropolitan area. Currently, the entire system is operated by the Taipei Rapid Transit Corporation (Traditional Chinese: ; pinyin: or TRTC).

The TRTS is one of the most expensive rapid transit systems ever constructed with the initial phase costing over US$18 billion. Since its completion, the TRTS has reduced travel time from one end of Taipei to the other from up to three or more hours to less than an hour, and has been effective in relieving some of Taipei's traffic congestion problems. The system has also proved effective as a catalyst for urban renewal, as well as increasing tourist traffic to outlying cities such as Danshuei (Danshui).

In addition to the rapid transit system itself, the TRTS also includes several public facilities such as underground shopping malls, parks, and public squares. Modifications to existing railway lines to integrate into the MRT are underway.

History

Ximen station
Enlarge
Ximen station

Danshui station
Enlarge
Danshui station

In 1967, the Taiwan Government researched the possibility of constructing a rapid transit network in the Taipei metropolitan area; however, the plan was shelved due to fiscal concerns and the belief that such a system was not urgently needed at the time. With the increase of traffic congestion accompanying economic growth in the 1970s, the need for a rapid transit system became more pressing.

The Executive Yuan approved the initial network plan for the system on May 27, 1986. Construction on the TRTS began on December 15, 1988. The system opened on March 28, 1996 with 10.5 km available on the Muzha Line, a medium-capacity line, with twelve stations between Zhongshan Junior High School to Taipei Zoo. The first heavy-capacity line, the Danshui (Danshuei) Line, was opened on March 28, 1997 between Danshui (Danshuei) to Zhongshan Station.

On December 24, 1999, a section of Banqiao (Banciao) /Nangang Line was opened between Longshan Temple and Taipei City Hall. This section becomes the first east-west line running through Taipei City and connects the two previously completed north-south lines.

The TRTS was the center of political controversy during its construction and shortly after the opening of its first line in 1996 due to incidents such as computer malfunction during a thunderstorm, alleged structural problems in some elevated segments, budget overruns, and fare prices. However by the time the first phase of construction was completed in 2000, it was generally agreed that the project was a success. The system has since become an essential part of life in Taipei.

On September 17, 2001, Typhoon Nari flooded all underground lines, including 16 stations, the heavy-capacity sytem operation control center, the administration building and the Nangang Depot. The elevated Muzha Line was not seriously affected and resumed operations the next day; however, the heavy-capacity lines were not restored to full operational status until three months later. Following this incident, the TRTS has devoted more resources to preventing flooding in the underground system.

On May 31, 2006, the second stage of the Banqiao (Banciao) Line and the Tucheng Line began operation. Currently the TRTS network has 7 lines totalling 77 km and 69 stations, with expansion continuing. In May 2006, TRTS achieved daily ridership of 995,850 riders. In terms of daily ridership, TRTS is larger than Washington D.C.'s Metrorail and Bay Area Rapid Transit in the San Francisco Bay Area.

Routes

Mezzanine of Zhongxiao Dunhua station
Enlarge
Mezzanine of Zhongxiao Dunhua station

Note: The following romanizations were taken from the [TRTC route page]

Current routes

Zhongshan Junior High School - Taipei Zoo
Elevated VAL.
10.9 km, 12 stations, completed on March 28, 1996.
Chiang Kai-Shek Memorial Hall - Danshui (Danshuei)
Includes underground, elevated, and surface level metro.
22.8 km, 20 stations, completed in December 24, 1998.
* Xinbeitou Branch Line (新北投支線)
:Beitou - Xinbeitou
:Elevated metro.
:1.1 km, 2 stations, completed on March 28, 1997.
Guting - Nanshijiao (Nanshihjiao)
Underground metro.
5.4 km, 5 stations, completed on December 24, 1998.
Xindian (Sindian) - Chiang Kai-Shek Memorial Hall
Underground metro.
9.3 km, 10 stations, completed on November 11, 1999.
* Xiaobitan (Siaobitan) Branch Line (小碧潭支線)
:Qizhang (Cijhang) - Xiaobitan (Siaobitan)
:1.9 km, 2 stations, completed on September 29, 2004.
* (Xiaonanmen Line) (小南門線)
:Ximen - Chiang Kai-Shek Memorial Hall
:Underground metro.
:1.6 km, 3 stations, completed in August 31, 2000.
Fuzhong - Kunyang
Underground metro.
18.1 km, 16 stations, completed on May 31, 2006.
Fuzhong - Yongning
Underground metro.
5.6 km, 4 stations, completed on May 31, 2006.
Beitou station
Enlarge
Beitou station

Zhongxiao Fuxing station on Muzha Line
Enlarge
Zhongxiao Fuxing station on Muzha Line

Entrance Number 3 to Zhongxiao Xinsheng station
Enlarge
Entrance Number 3 to Zhongxiao Xinsheng station

Routes under construction

Routes Chinese name Expected opening date Scheduled progress% Actual progress%
Neihu Line 內湖線 Between December, 2008 - March, 2009 63.33 60.3
  Jiannan Rd. ~ Taipei Nangang Exhibition Center   劍南路站~南港展覽館站 December, 2008
  Jiannan Rd. ~ Zhongshan Junior High School   劍南路站~中山國中站 March, 2009
Luzhou (Lujhou) Branch Line 蘆洲支線 December, 2009 71.35 73.32
Xinzhuang (Sinjhuang) Line 新莊線 51.66 55.27
  Huilong ~ Zhongxiao Xinsheng   迴龍站~忠孝新生站 December, 2009
  Zhongxiao Xinsheng ~ Dongmen   忠孝新生站~東門站 December, 2010
Circular Line 環狀線
  Shisizhang ~ Wugu Industrial Park   十四張站~五股工業區站 2010
  Shisizhang ~ Dapinglin   十四張站~大坪林站 2011
  Remaining underground stations   其餘地下段路線 2018
Nangang Line Eastern Extension 南港線東延段 34.7 36.86
  Kunyang ~ Nangang   昆陽站~南港站 December, 2008
  Nangang ~ Taipei Nangang Exhibition Center   南港站~南港展覽館站 December, 2010
CKS Airport MRT 中正機場捷運 0.89 0.84
  CKS Airport ~ Sanchong   中正機場~三重站 2009
  Sanchong ~ Taipei Main Station   三重站~臺北車站 2011
Xinyi Line 信義線 December, 2011 16.19 16.21
Songshan Line 松山線 December, 2012 11.85 11.65
Source: http://www.dorts.gov.tw/net/process.asp (Updated on June 1, 2006)

Operations

Inside a Taipei MRT train during rush hour.
Enlarge
Inside a Taipei MRT train during rush hour.

The TRTS opens 6 a.m. to midnight daily with extended service during special events. The interval is roughly 5-to-10 minutes between trains (shorter during peak hours).

Through operations are made between Xindian (Sindian) Line and Danshui (Danshuei) Line. In addition, trains from Zhonghe (Jhonghe) Line go on to run on the Danshui (Danshuei) Line before terminating at Beitou station. Only one train operates on the following shuttle lines: Xinbeitou Branch Line, Xiaonanmen Line, and Xiaobitan (Siaobitan) Branch Line.

TRTS uses stored-value cards or EasyCard (traditional Chinese: 悠遊卡), which is a form of smart card, to collect fares. Fares range from NT$20 to NT$65 with most locations accessible for around NT$20-30.

Stations are extremely crowded during rush hours, especially downtown stations such as Taipei Main Station. Tourist attractions such as the Shilin Night Market and Danshui (Tamsui) quickly fill up nearby stations during evenings and weekends.

Eating, drinking, smoking, and betel-nut-chewing are prohibited in the entire system. Automated station announcements are recorded in Mandarin, Taiwanese, Hakka, and English.

Fare Versus Traveling Distance

Distance
(km)
≤5 5~8 8~11 11~14 14~17 17~20 20~23 23~27 27~31 ≥31
Fare
(NT)
20 25 30 35 40 45 50 55 60 65

Rolling Stock

Medium-Capacity Trains

A medium-capacity train consists of 2 2-car Electric Multiple Unit (EMU) sets with a total of 4 cars. The Muzha Line uses the VAL 256 cars, with the two VAL 256 cars in the same set sharing the same road number. As a result of this numbering scheme, the car numbers of the VAL fleet only range from 1 to 51, despite there being 102 cars. The medium-capacity trains are rubber-tired trains with no onboard train operators and are operated remotely by the medium-capacity system operation control center. The Muzha Line uses the fixed-block Automatic Train Control (ATC) system.

In June 2003, Bombardier was awarded a contract to supply the complete Neihu Line mass transit system, which includes manufacturing 202 cars, installing the the communications-based CITYFLO 650 moving-block ATC system to replace the current fixed-block ATC and retrofitting the existing 102 VAL 256 cars with the CITYFLO 650 ATC system.

Heavy-Capacity Trains

In heavy-capacity lines, a train consists of 2 3-car EMU sets with the total of 6 cars. Each 3-car EMU set is permanently coupled as DM-T-M, where DM is the motor car with cab, T is a trailer car and M is the motor car without cab. Each motor car has two AC traction motors.

In Set XXX, the road number of a DM car is 1XXX, the road number of a T car is 2XXX and the road number of an M car is 3XXX. The table below shows the set numbers of the heavy-capacity car types, which include Types C301, C321, C341 and C371.

The configuration of a 6-car train is DM-T-M-M-T-DM. For example, if the car numbers of a C301 train is 1001-2001-3001-3015-2015-1015, two C301 sets 001 and 015 form this train.

A single set cannot be in revenue service except the C301 sets 013 and 014, where their M cars are converted to temporary cab cars to run the Xinbeitou Branch Line. When C301 sets 013 and 014 are replaced by C371 sets 397-399, their M cars will be converted back to non-cab motor cars.

Each heavy-capacity train is operated by a train operator on board. These cars are computer-controlled. The operator, who is both motorman and conductor, is responsible for opening and closing the doors and making special announcements occasionally. The overall computer-controlled system is known as Automatic Train Control (ATC). ATC controls all train movements - braking, acceleration and speed control, but can be manually overridden by the operator in the case of an emergency. In each cab there is a fully digital console with all of the appropriate controls.

Table of Rolling Stock

Car
Type
Year
Built
Builder Car
Length/
Width/
Height
Seating
Capacity

Per Car
Total
Capacity
Per Car
Max.
Speed
Fleet
Total
Car Numbers Lines
Currently On
Denotes
VAL
256
1993 Matra 13.78 m/
2.56 m/
3.53 m
24 114 80
km/h
102 MP 1-51Actually set number. MP stands for married pair. Cars in the 2-car set share the same road number. Muzha Line 2-Car Set
??? 2006- Bombardier 13.78 m/
2.54 m/
3.53 m
20 142 80
km/h
202 Muzha Line
Neihu Line
2-Car Set
C301 1992-
1993
URC
(Subsidiary
of Kawasaki)
23.5 m/
3.2 m/
3.6 m
60 368 90
km/h
132 1001-1044 (DMDM: motor car with cab.)
2001-2044 (TT: trailer car.)
3001-3044 (MM: motor car without cab.)
All Heavy-
Capacity Lines
3-Car Set (DM-T-M)2 C301 sets per train in revenue service except Sets 013 and 014, which M cars are temporarily converted to cab cars to run as single sets. The temporary cabs will be removed when C371 sets 397-399 are in service
Set no.: 001-044
C321 1997-
1999
Siemens AG 23.5 m/
3.2 m/
3.6 m
60 368 90
km/h
216 1101-1172 (DM)
2101-2172 (T)
3101-3172 (M)
All Heavy-
Capacity Lines
3-Car Set (DM-T-M)2 C321 sets per train in revenue service.
Set no.: 101-172
C341 2003 Siemens AG 23.5 m/
3.2 m/
3.6 m
60 368 90
km/h
36 1201-1212 (DM)
2201-2212 (T)
3201-3212 (M)
Banqiao –
Nangang Line

Tucheng Line
3-Car Set (DM-T-M)2 C341 sets per train in revenue service.
Set no.: 201-212
C371 2005- Kawasaki 23.5 m/
3.2 m/
3.6 m
60 368 90
km/h
321 1301-1338,
1397-1399,
1401-1466 (DM)
2301-2338,
2397-2399,
2401-2466 (T)
3301-3338,
3397-3399Cars 3397-3399 also have cabs. C371 sets 397-399 are going to run on Xinbeitou Branch Line and Xiaobitan (Siaobitan) Branch Line.,
3401-3466 (M)
All Heavy-
Capacity Lines
(Future)
3-Car Set (DM-T-M)2 C371 sets per train in revenue service except Sets 397-399, which can run as single sets.
Set no.: 301-338,
397-399, 401-466

For the photos of the rolling stock, check the [Chinese Wikipedia Site] of TRTS for details.

Other information

[Source]
Xiaobitan station
Enlarge
Xiaobitan station

Wangfang Hospital station entrance
Enlarge
Wangfang Hospital station entrance

Initial Systems & Trains: Nissho Iwai American Corporation, Kawasaki Rolling Stock, Matra.
New Systems & Trains: Siemens AG, SGP, Union Carriage.
  • Costs:
  • Initial Construction (1990 - 2000): US$18 Billion
    Second Phase Construction (allocated in 2003): US$13.8 Billion
  • Network Information:
  • *Medium-Capacity Metro Segment (Muzha Line):
    : System: VAL 256 Medium capacity trains, rubber tires, automatic computer control.
    : Maximum Speed: 80 km/hour
    : Maximum Capacity per Train Car: 114
    *Heavy-Capacity Metro Segments (All other lines):
    : System: 1,435 mm track, third rail current collection system at 750V DC, on-board train operator.
    : Maximum Speed: 80 km/hour
    : Maximum Capacity per Train Car: 368

    See also

    This page contains Chinese text.
    Without proper [Enabling East Asian charactersrendering support], you may see question marks, boxes, or other symbols instead of Chinese characters.

    References & notes

    External links

    Wikimedia Commons has media related to:
    [media]

    [[zh-min-nan:Tâi-pak chia̍t-ūn hē-thóng]]

     


    From Wikipedia, the Free Encyclopedia. Original article here. Support Wikipedia by contributing or donating.
    All text is available under the terms of the GNU Free Documentation License See Wikipedia Copyrights for details.


    Search Titles
    0123456789
    ABCDEFGHIJ
    KLMNOPQRST
    UVWXYZ?

    E-mail this article to:

    Personal Message: